CM 2013 and MFPT 2013

CM 2013 and MFPT 2013
CM 2013 and MFPT 2013

Friday 5 August 2011

BASF Fina facility plans for wireless

BASF Fina Petrochemicals LP a joint venture between BASF and Total Petrochemicals USA Inc has established a wireless application plan at its Port Arthur, Texas, site, which houses one of the largest steam crackers in the world.
The wireless plan is based on an on-site survey, which included an RF spectrum analysis, various grid simulation output with signal power levels, and a technical evaluation of the site’s existing infrastructure and technology. These findings provided the basis for BASF Fina’s plan: outlining the implementation programme for its wireless network and applications, as well as scope for future expansions.


Read more: http://www.theengineer.co.uk/channels/process-engineering/basf-fina-facility-plans-for-wireless/1009337.article#ixzz1U8aEkkJd

No comments:

Post a Comment